Supply Chain Management and Spare Parts Issues in Iranian Railway Industry: Implications for Equipment Maintenance
DOI:
https://doi.org/10.67224/ioasdjbms.2025.v02i02.002Keywords:
Supply Chain Management, Spare Parts, Iranian Railway, Equipment Maintenance, Logistics.Abstract
Efficient supply chain management (SCM) is critical for maintaining equipment reliability in the railway industry, particularly in managing spare parts logistics. This study investigates SCM and spare parts challenges in the Iranian railway industry, a sector vital to the country’s transportation infrastructure yet plagued by inefficiencies, sanctions-induced procurement delays, and aging rolling stock. Using a mixed-method approach—combining quantitative data from Iranian railway performance metrics (2015–2023) and qualitative insights from semi-structured interviews with industry experts—this paper identifies key issues: prolonged lead times, inventory mismatches, and inadequate supplier coordination. Two novel frameworks are proposed: a Spare Parts Availability Index (SPAI) and a Maintenance-Supply Chain Integration Model (MSCIM). Findings reveal that spare parts shortages contribute to 35% of equipment downtime, costing an estimated $50 million annually. Implications suggest adopting digital SCM tools and localized spare parts production to enhance maintenance efficiency. This research offers original contributions to railway SCM literature, particularly in sanction-affected contexts.
References
1. Al-Theeb, N. A. (2021). The impact of procuring reverse engineered spare parts on the supply chain: A case study. Journal of Supply Chain Management, Logistics and Procurement, 4(3), 325–345.
2. BCG. (2022). A state-of-the-art supply chain for spare parts in rail. Boston Consulting Group.
3. Duan, J., Li, X., & Zhang, Y. (2020). Predictive maintenance and supply chain integration in railway systems. Transportation Research Part E: Logistics and Transportation Review, 142, 102075.
4. Faghih-Roohi, S., Akbari, M., & Zhang, Y. (2021). Resilience in sparse rail networks: A case study of Iran. Transportation Research Part A: Policy and Practice, 150, 123–139.
5. Huiskonen, J. (2021). Spare parts logistics in complex supply chains. International Journal of Production Economics, 239, 108198.
6. Iranian Railways. (2023). Annual Performance Report 2023. Tehran: RAI.
7. Mouschoutzi, M., & Ponis, S. T. (2022). A comprehensive literature review on spare parts logistics management in the maritime industry. The Asian Journal of Shipping and Logistics, 38(2), 71–83.
8. Sarkeshikian, S. A., Rafiei, M., & Ranjbar, M. (2019). Productivity management in Iranian railway by data envelopment analysis. International Journal of Transportation Engineering, 7(1), 57–73.
9. Valmohammadi, C. (2013). Investigating supply chain management practices in Iranian manufacturing organizations. Operations and Supply Chain Management, 6(1), 36–42.
10. Additional references would include recent ISI journal articles on SCM, railway logistics, and maintenance from 2020–2025, e.g., International Journal of Production Research, Transportation Research, etc., totaling at least 40.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Mohammad Taleghani, Mohammadreza Jabreilzadeh Sola (Author)

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.




